Set the period, accepted-unit gate, process perimeter and allocation methods before comparing performance. Retain the original baseline for every project proposal.
- Accepted units
- None counted yet
- Claims
- None made
- Custody gaps
- Not yet assessed
Align meter intervals with production runs, then reconcile withdrawal, consumption, discharge and energy. Show absolute loads and accepted-unit intensity together.
- Accepted units
- Counted at release only
- Claims
- Held until loads join
- Custody gaps
- Listed as found
Flag missing custody events, failed checks and unsupported allocations. Return rework to the chain with added loads, never as a fresh identity or extra accepted unit.
- Accepted units
- Rework adds load, never units
- Claims
- One claim withheld (illustrative)
- Custody gaps
- One gap quarantined (illustrative)
Compare like with like, test mix and volume effects, and check absolute load. Withhold reduction claims until the evidence owner accepts the verification pack.
- Accepted units
- Accepted units only
- Claims
- Withheld until the evidence owner accepts
- Custody gaps
- Carried, and limits the claim