AA: defaults (auto-saved)
USD / std min, Cameroon
Cambodia 0.0251 · Cameroon efficiency 45.0%
CAMEROON / EARNED STANDARD MINUTE
USD
paid minute 0.0058 · efficiency 45.0%
CAMBODIA / EARNED STANDARD MINUTE
USD
paid minute 0.0163 · efficiency 65.0%
Parity at 23.1% Cameroon efficiency. At 45.0% Cameroon costs 48.7% less per standard minute than Cambodia.
GFT instruments / Work and value
A lower wage can buy a more expensive minute. Compare historical Cameroon and Cambodia wage benchmarks through your own hours, efficiency and exchange-rate assumptions.
Cameroon 0.0129Cambodia 0.0251USD / std min
01 / The bench · wages only, scenario model
At the illustrative operating assumptions, Cameroon costs 0.0129 USD per standard minute and Cambodia costs 0.0251 USD. These are calculated examples, not observed factory performance. Change the inputs. Read the result. Keep the assumptions visible.
Cameroon / cost per standard minute
USD / min
Cameroon is 48.7% lower in cost per standard minute than Cambodia under these assumptions. This is an output-adjusted wage comparison, conditional on the efficiency and hours you entered.
0.012890 USD × 5,616.0 standard min = 72.39 USD monthly wage. Calculated using unrounded values.
Move across the chart to read a cost and the Cameroon efficiency that would match it. Hover a table row to light its markers.
The crossover point
Cameroon reaches Cambodia’s entered cost at 23.1% efficiency. Above this crossing Cameroon costs less; below it Cameroon costs more.
| Benchmark | Nominal / min | Effective / min | Per garment |
|---|---|---|---|
| Cameroon | 0.0058 | 0.0129 | 0.155 |
| Cambodia | 0.0163 | 0.0251 | 0.302 |
All outputs are derived scenarios. Wage benchmarks are historical. The thread between bead and diamond measures the efficiency penalty, not a second wage.
02 / Hold the baseline, change the plan
Save the current inputs as A, then edit B above. Compare a ramp-up plan, a wage change or a different product. A stays in this page’s memory until reset or navigation. A shared link contains both scenarios when A is saved.
AA: defaults (auto-saved)
USD / std min, Cameroon
Cambodia 0.0251 · Cameroon efficiency 45.0%
BB: current scenario
USD / std min, Cameroon
Cambodia 0.0251 · Cameroon efficiency 45.0%
Delta 0.0000 USD, no change yet: A and B both hold the programme defaults. Move B above, or tap a ghost tick to apply that preset to B.
| Input or result | Saved A | Current B | Difference |
|---|---|---|---|
| Cameroon efficiency (%) | 45.0 | 45.0 | 0.00 |
| Cambodia efficiency (%) | 65.0 | 65.0 | 0.00 |
| Cameroon effective (USD/min) | 0.0129 | 0.0129 | 0.0000 |
| Cambodia effective (USD/min) | 0.0251 | 0.0251 | 0.0000 |
Step
72.39USD / month
0.0058USD / paid min
45.0%of paid time
0.0129USD / std min
0.155USD / garment
XAF 43,969 ÷ 655.957 × 1.08 = 72.39 USD
Cameroon 72.39 and Cambodia 204.00 USD on one scale.
12,480 paid minutes: 208 hours × 60. The bead lands on the cost axis.
5,616 earned of 12,480 paid minutes light up. The rest is paid time without standard output.
Penalty ×2.22. Cambodia’s thread runs 0.0163 to 0.0251.
Twelve diamonds strung as one garment of 12 standard minutes. Cambodia’s strand: 0.302.
03 / Method · a common denominator
Comparing monthly wages alone silently assumes equal standard output in equal paid time. Five steps remove that assumption.
01 / 05
One worker’s cash wage for the month. Cameroon’s XAF figure converts to USD through the euro peg and your USD per EUR assumption. Cambodia’s benchmark is already in USD.
wage in USD = wage in XAF ÷ 655.957 × USD per EUR02 / 05
Paid minutes are the month’s paid hours times sixty. The wage divided by them is the nominal rate: the price of a minute on the clock.
nominal rate = wage ÷ (paid hours × 60)03 / 05
Efficiency is earned standard minutes divided by paid minutes. Only that share of the paid time produces standard work, so the earned minutes are fewer than the paid ones.
earned minutes = paid minutes × efficiency04 / 05
Divide the same wage by the earned minutes. The result equals the nominal rate divided by efficiency. The gap between the two rates is the efficiency penalty.
effective rate = wage ÷ earned minutes05 / 05
Multiply the effective rate by the garment’s standard minutes. Both rows use the same garment, so the per-garment comparison keeps the ranking of the minute costs.
garment cost = effective rate × standard minutes04 / Provenance · the model on one thread
Every default says where it comes from.
Monthly wage ÷ (monthly paid hours × 60 × efficiency). Standard garment minutes multiply the effective minute rate. All currencies reconcile through XAF 655.957 per EUR and your USD per EUR assumption.
04 / Standard minute 72.39 ÷ 5,616 = 0.0129 USD per standard minute
Method source
Programme evidence: R14 (Cameroon, 2024), R17 (Cambodia, 2024), R32 (euro peg). Operating assumptions are illustrative.
A planning aid. Not investment, legal or tax advice. Verify inputs and boundaries before an operational decision.
The crossing holds Cambodia’s wage, hours and efficiency fixed while varying Cameroon’s efficiency. A crossing above the efficiency ceiling cannot be reached inside this model. Zero wages are accepted for sensitivity analysis; a zero reference wage has no finite relative cost percentage. A zero efficiency is rejected because no productive denominator exists.
Calculations retain full precision; the displayed monthly reconciliation uses rounded terms and therefore may show a small rounding difference. Reconciliation: effective rate × earned standard minutes = monthly wage.
The source record is the programme evidence register. Its domain references are not independent verification of a current law or a full article. No additional national wage benchmark has been introduced. Changing a wage makes that input your scenario assumption; the historical source remains the explanation of the reset value. The equal-efficiency preset uses an illustrative common efficiency of 65%. The reversal preset uses an illustrative Cameroon efficiency of 15%, leaving the other defaults fixed.
Three defaults carry a dated source. Five are illustrative operating choices and three rows summarise the derived outputs. Select or hover a row to light its thread in the sticky mini-loom.
| Input / Output | Default / Value | Status | Feeds knot | Action |
|---|---|---|---|---|
| 01Cameroon wage | XAF 43,969 / month | Sourced, dated | knot 01 · wage | |
| 02Cambodia wage | USD 204 / month | Sourced, dated | knot 01 · wage | |
| 03Euro peg | XAF 655.957 / EUR | Sourced, dated | knot 01 · wage | |
| 04USD per EUR | 1.08 | Illustrative | knot 01 · wage | |
| 05Paid hours | 208 / month, each row | Illustrative | knot 02 · paid minutes | |
| 06Efficiency | Cameroon 45%; Cambodia 65% | Illustrative | knot 03 · efficiency | |
| 07Garment work content | 12 standard min | Illustrative | knot 05 · garment | |
| 08Optional benchmark | USD 150; 208 hours; 55% | Illustrative | off by default | |
| D1Effective minute rate | Cameroon 0.0129; Cambodia 0.0251 USD | Derived output | knot 04 · standard minute | |
| D2Garment wage cost | Cameroon 0.155; Cambodia 0.302 USD | Derived output | knot 05 · garment | |
| D3Parity crossover | 23.1% Cameroon efficiency | Derived output | knot 03 · efficiency |
05 / On the floor · illustrative
Earned view: the price of the minutes that produced standard work.
Each month is woven from its paid hours: 26 paid days across, 8 paid hours down, one cell per hour. Lit cells are earned standard minutes; dim cells are paid time that produced no standard output. Slide the efficiency and watch the cloth fill.
Cameroon / one worker, one paid month
USD per earned standard minute
5,616 of 12,480 paid minutes earned · about 468 garments of 12 standard minutes per month (illustrative). 55.0% of paid time produced no standard output.
Cambodia / one worker, one paid month
USD per earned standard minute
8,112 of 12,480 paid minutes earned · about 676 garments of 12 standard minutes per month (illustrative). 35.0% of paid time produced no standard output.
Cameroon cost per garment, now and after a ten-point efficiency gain
0.1550.127USD / garment
−0.028, 18.2% lower, with wages and hours held fixed.
Paid hours include whatever paid idle time the wage covers; excluding that time would understate the denominator’s relationship to the actual payroll boundary.
Garments one paid month covers, at the standard minutes you set
A measured result above that ceiling calls for a separate study of the standard and the time boundary. It does not justify silently clamping a factory’s data. The accepted hour and wage bounds are numerical modelling limits, not statements about lawful pay or working time.
Cameroon cost per garment at seven efficiencies, against Cambodia’s line
Cameroon at 45.0% costs 0.155 USD per garment. Press a column to set the efficiency; wages and hours stay as entered.
A low result therefore supports a question for diligence, rather than a location recommendation or an investment return forecast.
Wages only: 0 of 13 named costs flagged for your own data.
06 / Operating interpretation
01 / Factory manager / the ramp-up
Record paid minutes and earned standard minutes for the same operators, product and period. If training improves measured efficiency, change that input and see how much wage cost per garment falls. Do not treat the crossing as a target to increase work pressure. Check safe work practices, downtime, skill mix, staffing balance and standard accuracy together.
02 / Engineer / the standard
If two factories use different operation bulletins, allowances or quality definitions, their reported efficiencies are not directly comparable. This tool caps efficiency at the nominal standard ceiling for clarity.
03 / Investor / the sensitivity
An investor can compare the illustrative ramp-up scenario with a later operating scenario by saving A and editing B. The result isolates wage cost only. Standard garment minutes must represent comparable accepted work; quality differences require an explicit additional model.
04 / What the wage leaves out
Press a cost to flag it for your own data. Each flagged cost sits outside this wage-only bar. The bar is a schematic, not a cost share.
07 / Follow the measurement
The related research catalogue holds three papers on the work around this wage model. Each card below draws a figure from the model on this page. Each paper page states its own status.
WP09 · read from the model 0.0387 · 0.0129 · 0.0089 USD per standard minute at 15, 45 and 65% Cameroon efficiency
Current scenarioCameroon 0.0129Cambodia 0.0251Parity 23.1%
08 / The crossing · where the advantage ends
Use measured standard work, consistent paid hours and comparable quality. This instrument isolates wages; it does not establish total factory competitiveness or a lawful payroll.
Cameroon is 48.7% lower in cost per standard minute than Cambodia under these assumptions. This is an output-adjusted wage comparison, conditional on the efficiency and hours you entered.
Open the instrument with this scenarioCameroon / garment0.155
Cambodia / garment0.302
USD per garment at Cameroon efficiency 45.0% · Parity 23.1%
Final parity scrubber · carry the garment thread forward
Parity 23.1% · Current efficiency 45.0% · Carry-over 0.155 USD / garment
Carry 0.155 USD (Cameroon) and 0.302 USD (Cambodia) per garment into the resource-intensity boundary.
Payroll check
The two wage benchmarks refer to 2024. They are not a claim about current minimum wages or sector coverage. Confirm applicable pay, benefits, overtime and statutory contributions before using a scenario for a real decision. This is not legal, tax or investment advice.