Principle 01Keep product, batch, line, shift and event identities consistent. Define the schema, access rights and correction history before integration. If a vendor changes, the operation should retain the records and definitions needed to interpret its own performance.
Principle 02Assess a supplied capability on representative materials and working conditions. Include difficult examples and the consequences of false decisions. The procurement requirement should specify the evidence that would establish fitness for the proposed use, rather than accept a generic benchmark as local proof.
Principle 03Place model outputs inside the operating review, with uncertainty and a route to challenge them. Define who can release a batch, revise a plan or suspend a model. Automating the observation does not automatically authorise the resulting operational decision.