Skip to content
GREEN FUTURETECH.
Explore
PV arch, 200.0 kWp4 lines × 20 kWOutage 14:00 to 18:00Usable reserveIllustrative day, single synthetic day
PV arch, 200.0 kWp4 lines × 20 kWOutage 14:00 to 18:00Usable reserveIllustrative day, single synthetic day
Solar
71.6 kW
Load
80.0 kW
Reserve
99 %
Grid
Out

GFT instruments / Energy continuity

Keep the line running.
Size against the clock.

Illustrative default: 200 kWp of solar and 444.4 kWh of battery for an 80 kW production load. Put the outage on the day curve to test what that equipment can serve.

Operate the instrumentProcedural visualisation. Schematic, not a facility.

01 / An instrument for the decision

How much solar and storage keeps the line running through outages?

Drag the outage across the day, or use the presets and sliders. Every curve, figure and read-out below answers as you move. Every starting input is an assumption, not a GFT programme measurement or a supplier quotation.

Illustrative / single day
Synthetic day on one clock: production lines as threads coloured by the source that serves each quarter hour (solar ochre, battery sage, grid grey, unserved coral), the solar arch, the draggable outage window, and the usable battery reserve below.
4 lines × 20 kW = 80.0 kWUsable reserve, % of windowA = illustrative default
Outage 14:00 to 18:00
Energy-match solar
200.0kWp

No change vs A (200.0)

Nominal battery
444.4kWh

No change vs A (444.4)

Unserved production
0.0kWh/day

No change vs A (0.0)

Illustrative equipment budget
301,111USD, illustrative

No change vs A (301,111)

  • Solar serves the line
  • Battery serves the line
  • Grid serves the line
  • Unserved
  • Outage window, draggable
  • Usable reserve
  • Scenario A

15:00 to 15:15 · Grid unavailable · Battery serving load

Load
80.0 kW
PV
71.6 kW
Battery to load
8.4 kW
Reserve at interval end
99.1 %
Read the condition

The model serves the selected outage with the chosen solar curve and a full initial battery. This is a single-day energy result, not a guarantee of uninterrupted production. The battery finishes below its starting reserve, so repeating this day requires additional charging or a revised schedule.

Illustrative presets

A is the illustrative default. Change the controls to test B.

Production inputs
Outage inputs
Solar inputs
Storage inputs
Budget inputs

Changes recalculate immediately. Opening a shared link restores its inputs, including a held A.

Power is the interval average. Reserve is measured at the interval end as a share of the usable window, not absolute cell state of charge. The sun arc is schematic.

02 / The calculation is open

Energy balance comes before a continuity claim.

Four steps take your sliders to the verdict. The pinned drawing redraws on each step from your live inputs. The shift may cross midnight, and the outage follows the same local clock. An outage outside production does not test live-line backup.

1 / Load: what must stay on80.0 kW800.0 kWh/day

2 / Solar: match the energy, then test timing200.0 kWp4.0 kWh/kWp/day

3 / Battery: keep a usable energy window444.4 kWh nominal

4 / Dispatch: account for every flow800.0 kWh served0.0 kWh unserved

00:0006:0012:0018:0000:00Nominal444.4 kWhUsable window355.6 kWhDelivered to the load320.0 kWhsame energy, different clockShift 08:00 to 18:00, 10 h

Add lighting, ventilation, compressed air, controls and other essential services to your measured boundary before sizing equipment.

The arch is a modelling assumption, not an observed sunrise, cloud pattern or season for Cameroon.

Charging efficiency is a separate assumption; ηc × ηd is the round trip in this simplified model.

PV 800.0 + grid 17.3 + battery 123.7 = served 800.0 + charge 0.0 + curtailed 141.1 kWh

Running load
80.0 kW
Daily production energy
800.0 kWh
Grid energy still needed
17.3 kWh/day
Day-end usable reserve
218.1 kWh
Curtailed solar
141.1 kWh/day
Battery power allowance
80.0 kW

Grid charging and tariff arbitrage are excluded so that dependence on the initial reserve stays visible.

P = line kW × lines · E = P × shift hours20 × 4 = 80.0 kW · 80.0 × 10 = 800.0 kWh

PV kWp = E ÷ Y × sizing % ÷ 100800.0 ÷ 4.0 × 100% = 200.0 kWp

B = P × autonomy ÷ u ÷ ηd80 × 4 ÷ 0.80 ÷ 0.90 = 444.4 kWh

PV + grid + discharge = served + charge + curtailment · Load = served + unserved800.0 + 17.3 + 123.7 = 800.0 + 0.0 + 141.1 kWh

  1. Step 01 of 04

    Define what must stay on.

    Start with the simultaneous running demand, not the sum of machine nameplates. Each selected line is a constant load while production is scheduled. The worked example is 20 kW per line across 4 lines: 80 kW, and 800 kWh over a 10-hour shift.

    P = line kW × lines · E = P × shift hours20 × 4 = 80.0 kW · 80.0 × 10 = 800.0 kWh

  2. Step 02 of 04

    Match energy, then test timing.

    At the illustrative net yield of 4 kWh per kWp per day and 100% sizing, the example needs 200 kWp. Yield means final AC energy after PV system losses: do not enter raw irradiance or deduct the same losses twice. The solar shape is a synthetic half-sine from 06:00 to 18:00, normalised to that energy.

    PV kWp = E ÷ Y × sizing % ÷ 100800.0 ÷ 4.0 × 100% = 200.0 kWp

  3. Step 03 of 04

    Keep a usable energy window.

    Four hours at 80 kW require 320 kWh delivered to the load. With an illustrative usable fraction of 0.80 and discharge efficiency of 0.90, nominal capacity is 444.4 kWh and the usable internal window is 355.6 kWh.

    B = P × autonomy ÷ u ÷ ηd80 × 4 ÷ 0.80 ÷ 0.90 = 444.4 kWh

  4. Step 04 of 04

    Account for every flow.

    PV serves production first. Surplus charges the battery up to the usable ceiling and the power allowance; the rest is curtailed, with no export credit. The battery supplies a deficit only while the grid is unavailable.

    PV + grid + discharge = served + charge + curtailment · Load = served + unserved800.0 + 17.3 + 123.7 = 800.0 + 0.0 + 141.1 kWh

03 / Assumptions are part of the result

Every starting number is illustrative.

No electrical load, outage record, solar yield or equipment price is established by the programme evidence for this tool, so no preset is labelled as GFT programme defaults. Each value below is a demonstration to replace with site measurements and supplier data. The control limits are screening boundaries, not equipment ratings.

What must stay on: the running load per line, the lines running together, and the shift window they run in.

When the grid is unavailable: the start and length of the single daily outage that is tested against the shift.

What the sun supplies: the net yield and the sizing rule that matches array energy to the day.

What the battery can give: autonomy without sun, the usable share, and one-way efficiencies.

What it costs, as arithmetic: two unit prices and a fixed allowance. Never a quotation.

Running power per line

20 kWDiffers

Lines running together

4 linesDiffers

Production starts

8 hourDiffers

Daily production duration

10 h/dayDiffers

Outage starts

14 hourDiffers

Outage duration

4 hoursDiffers

Net daily solar yield

4 kWh/kWp/dayDiffers

PV versus daily energy match

100 %Differs

Battery autonomy without sun

4 hoursDiffers

Usable share of nameplate

80 %Differs

AC to stored-energy efficiency

95 %Differs

Stored energy to AC efficiency

90 %Differs

Installed solar unit price

850 USD/kWpDiffers

Installed battery unit price

250 USD/kWhDiffers

Additional fixed allowance

20000 USDDiffers

The synthetic solar shape runs from 06:00 to 18:00. It is a positive half-sine evaluated at the midpoint of each quarter hour and normalised so that its integrated energy equals installed kWp multiplied by your net daily yield. This fixed daylight window is a modelling assumption. Battery charge and discharge power are each limited to the full running line load; that allowance is not an inverter selection.

4.0kWh/kWp/day, illustrative

A lower yield asks for a larger array. This slider moves the same input as the bench controls.

04 / Keep the source with the input

Bring a site yield into the model.

Array nameplate at the dialled yield. Energy-match solar becomes 200.0 kWp.

Source receipt

The European Commission Joint Research Centre's PVGIS user manual ↗ describes a workflow for estimating PV production for a chosen location. Use the site's coordinates, mounting, orientation and losses to obtain a relevant net electrical yield, then test a difficult production season rather than an annual daily average. The manual was opened on 30 October 2026. No local yield for Douala or Garoua was extracted or implied here.

Not validated by the link

The equations and dispatch logic are GFT screening arithmetic, separate from PVGIS's detailed simulation, and not validated by linking to it. Before procurement, export the scenario, record where every substituted input came from, and reconcile it with an interval load record and the supplier's stated usable capacity and efficiency boundary.

05 / Usable against required

The battery has its own ledger.

The day starts with the usable battery window full. Charge and discharge are AC energy totals. A lower reserve at the end means the next day cannot simply start from the same condition without additional energy. For a shift or outage wrapping across midnight, the chart includes its early-day and late-day portions. It remains a single synthetic day, not a sequential multi-day weather simulation.

Usable from the battery, at the start320.0kWh AC
Required through the outage123.7kWh AC

Served. The reserve covers the outage.

End reserve = start reserve + charge × ηc − discharge ÷ ηd

355.6 + 0.0 × 0.95 − 123.7 ÷ 0.90 = 218.1 kWh

Required energy is what the battery supplies plus what stays unserved. Usable energy is the full window at the start of the day, after discharge losses.

Energy: the whole window, with usable (sage) against required (ochre), in kWh AC from your live inputs.

Power: the 14:00 edge of the window at twelve times scale. Illustrative drawing. Not a measurement.

Site: shade cut into the arch and a site schematic. Outside this screening boundary. Drawing, not a site survey.

Budget: the day collapsed into its cost bar. Illustrative USD, from your live inputs.

06 / Engineering continues at the site

A served day still needs a protection design.

Energy is only the first question.

The tool answers whether the battery can last through the outage on this synthetic day. A battery with sufficient kWh may still be unable to start or support a machine. Power, protection and the site itself come next.

Usable
320.0 kWh
Required
123.7 kWh

Power and protection are outside the model.

The tool assumes compatible island-capable PV and battery controls are available during the outage. It does not model automatic transfer delay, motor starting, reactive power, voltage dips, harmonics, protection coordination, anti-islanding behaviour or black start. The engineer must check continuous and surge kW, kVA, fault duties, cable sizing, earthing and switching arrangements.

The site decides what the model cannot.

Solar shading, roof condition, structural load, temperature, rain, soiling, degradation, battery ageing, cooling, fire protection, space and maintenance are outside this screening boundary. Each one can change the energy or the safety case, and each needs a site assessment.

  • Shading
  • Roof condition
  • Structural load
  • Temperature
  • Rain
  • Soiling
  • Degradation
  • Battery ageing
  • Cooling
  • Fire protection
  • Space
  • Maintenance

The budget is arithmetic, not a quotation.

Solar kWp multiplied by your solar unit price, plus nominal battery kWh multiplied by your battery unit price, plus the fixed allowance. Unit-price scope must be consistent. Financing, replacement, operating costs, taxes, duties and residual value are excluded unless included explicitly in your allowance. This is not a quotation, investment recommendation or bankable engineering study.

Solar
170,000
Battery
111,111
Fixed allowance
20,000

07 / Commission against a measured duty

Commission the power system against a measured duty.

Replace the illustrative line demand with an interval meter record. Define critical machines and shared services, then test the low-solar season and actual outage timing. A daily energy match does not establish power quality, transfer performance or safe island operation.

Replace with your meter record

ServedThe reserve covers this outage on the modelled day.

Or choose a duty pattern
Solar
200.0 kWp
Battery
444.4 kWh
Unserved
0.0 kWh/day
Commissioning strip: the day's threads coloured by who serves them, the draggable outage window and the verdict stamp.

Served

A full battery is a starting condition, not a free daily supply. The modelled day ends at 61% of the starting reserve. If the day ends below its starting reserve, this operating pattern needs extra charging before it can repeat. Even a balanced day needs a site study, equipment ratings and a protection design before any claim of continuity.

The model stays visible

Daily load = kW per line × simultaneous lines × production hours. Energy-match PV = daily load ÷ net yield. Nominal battery = running load × autonomy ÷ usable fraction ÷ discharge efficiency. Dispatch balances the AC bus in quarter-hour intervals.

A planning aid. Not investment, legal or tax advice. Verify inputs and boundaries before an operational decision. Method source: GFT illustrative screening arithmetic; PVGIS for the solar resource-data workflow ↗

Read the measurement approach

Find a thread.