R06 · Grade C · inherited record
Cameroon Trade Hub
Inherited evidence R06
About 95 percent of cotton fibre exported raw against 5 percent processed locally; industrialisation target of 50 percent local processing.
Publication date unrecorded. Inherited source-text record. The original publication has not been independently reopened for this web edition.
R07 · Grade C · inherited record
Ecofin Agency
Inherited evidence R07
SND30 restates the 50 percent local-processing target by 2030.
Publication date unrecorded. Inherited source-text record. The original publication has not been independently reopened for this web edition.
R12 · Grade C · inherited record
Business in Cameroon
Inherited evidence R12
CICAM capacity utilisation, July 2023 report: Garoua 33.7 percent, CICAM 1 48.9 percent, CICAM 2 10.83 percent; underutilisation cost about CFAF 2 billion in 2020.
Publication date unrecorded. Inherited source-text record. The original publication has not been independently reopened for this web edition.
c05-S01 · Grade A
International Society of Automation
Update to ISA-95 Standard Addresses Integration of Enterprise and Manufacturing Control Systems
ANSI/ISA-95.00.01-2025, also known as ISA-95 Part 1, summarizes the scope of the manufacturing operations and control domain, discusses how physical assets of a manufacturing enterprise are organized, lists the functions associated with the interface between control functions and enterprise functions and describes the information shared among these functions.
2025-04-10. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S02 · Grade A
International Electrotechnical Commission
IEC 62264-1:2013: Enterprise-control system integration, Part 1: Models and terminology
IEC 62264-1:2013 describes the manufacturing operations management domain (Level 3) and its activities, and the interface content and associated transactions within Level 3 and between Level 3 and Level 4.
2013-05-22. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S04 · Grade A
OPC Foundation
OPC-10000-1: OPC Unified Architecture, Part 1: Overview and Concepts
The OPC UA is layered to isolate the core design from the underlying computing technology and network transport.
2025-10-22. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S07 · Grade A
Industrial Digital Twin Association
Specification of the Asset Administration Shell Part 1: Metamodel, IDTA 01001-3-0-1
The aim of this document is to define selected specifications of the structure of the Administration Shell to enable the meaningful exchange of information about assets and I4.0 components between partners in a value creation network.
2024-06. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S08 · Grade A
International Organization for Standardization
ISO 22400-2:2014: Automation systems and integration, Key performance indicators for manufacturing operations management, Part 2: Definitions and descriptions
The KPIs are presented by means of their formula and corresponding elements, their time behaviour, their unit/dimension and other characteristics.
2014-01. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S09 · Grade A
Modbus Organization
MODBUS Application Protocol Specification V1.1b3
MODBUS is a request/reply protocol and offers services specified by function codes.
2012-04-26. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S10 · Grade A
IO-Link Community
IO-Link Interface and System Specification, Version 1.1.4
The Process Data Exchange unit cyclically transmits and receives Process Data without interference from the On-request Data (parameters, commands, and Events).
2024-06. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S11 · Grade A
PROFIBUS Nutzerorganisation
PROFINET System Description: Technology and Application
For high-precision closed-loop control tasks, deterministic and isochronous transmission of time-critical process data with a jitter of less than 1 μs is possible.
2018-11. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S12 · Grade A
IEEE Standards Association
IEEE 1588-2019: IEEE Standard for a Precision Clock Synchronization Protocol for Networked Measurement and Control Systems
The protocol supports synchronization accuracy and precision in the sub-microsecond range with minimal network and local computing resources.
2020-06-16. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S13 · Grade A
Internet Engineering Task Force and RFC Editor
Network Time Protocol Version 4: Protocol and Algorithms Specification
NTPv4 includes fundamental improvements in the mitigation and discipline algorithms that extend the potential accuracy to the tens of microseconds with modern workstations and fast LANs.
2010-06. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S14 · Grade A
World Wide Web Consortium
Web of Things Architecture 1.1
An industrial edge device collects selected data from various controllers and makes it available to a cloud backend service, e.g., for remote monitoring via a dashboard or analyzes it for preventive maintenance.
2023-12-05. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S15 · Grade A
GS1 AISBL
EPCIS Standard, Release 2.0
The goal of EPCIS is to enable disparate applications to create and share visibility event data, both within and across enterprises.
2022-06. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S17 · Grade A
National Institute of Standards and Technology
NIST SP 800-82 Rev. 3: Guide to Operational Technology Security
This document provides guidance on how to secure operational technology (OT) while addressing their unique performance, reliability, and safety requirements.
2023-09. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S19 · Grade A
International Electrotechnical Commission
IEC 62443-3-2:2020: Security for industrial automation and control systems, Part 3-2: Security risk assessment for system design
A key concept in this document is the application of IACS security zones and conduits.
2020-06. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S20 · Grade A
Cybersecurity and Infrastructure Security Agency
Cybersecurity Performance Goals 2.0
OT: MFA is enabled on all accounts and systems that can be accessed remotely, including vendors/maintenance accounts, remotely accessible user and engineering workstations, and remotely accessible HMIs when available.
2025-12. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S21 · Grade A
CISA and joint international cybersecurity authorities
Russian State-Sponsored and Criminal Cyber Threats to Critical Infrastructure
Regularly test backup procedures and ensure that backups are isolated from network connections that could enable the spread of malware.
2022-05-09. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S22 · Grade A
National Institute of Standards and Technology
NIST SP 800-34 Rev. 1: Contingency Planning Guide for Federal Information Systems
Testing validates recovery capabilities, whereas training prepares recovery personnel for plan activation and exercising the plan identifies planning gaps; combined, the activities improve plan effectiveness and overall organization preparedness.
2010-11-11. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S23 · Grade A
International Electrotechnical Commission
Ensuring safety in the workplace
Within the overall safety of a system, functional safety refers to the aspect that provides automatic protection in response to errors.
2022-04-28. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S24 · Grade A
International Organization for Standardization and International Electrotechnical Commission
ISO/IEC 27001:2022: Information security, cybersecurity and privacy protection, Information security management systems, Requirements
The ISO/IEC 27001 standard provides companies of any size and from all sectors of activity with guidance for establishing, implementing, maintaining and continually improving an information security management system.
2022-10. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S25 · Grade B
Springer Nature, International Journal of Advanced Manufacturing Technology
An RFID-based tracking system for denim production processes
The most striking result from the case study is that a radio frequency identification application could be successfully implemented to support the tracking and tracing of work in process in denim production processes, an area in which studies about radio frequency identification applications have not been done.
2016-09-05. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S26 · Grade B
MDPI, Electronics
Textile Defect Detection Using Artificial Intelligence and Computer Vision: A Preliminary Deep Learning Approach
Data acquired in complex industrial settings are highly susceptible to external variables such as lighting variations and background noise, which can significantly degrade the detection accuracy of machine learning (ML) models [14].
2025-09-18. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S27 · Grade B
MDPI, Applied Sciences
Digital and Sustainable Transition in Textile Industry through Internet of Things Technologies: A Pakistani Case Study
Figure 8 illustrates changes in water level, depicting fluctuations that enable the industry to optimize water usage.
2024-06-21. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S28 · Grade B
Elsevier, Robotics and Computer-Integrated Manufacturing
RFID-enabled real-time manufacturing execution system for mass-customization production
RFID devices are deployed systematically on the shop-floor to track and trace manufacturing objects and collect real-time production data.
2013-04. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S29 · Grade B
MDPI, IoT
Industrial IoT-Based Energy Monitoring System: Using Data Processing at Edge
Once the edge receives the meter's data, it stores the information in the database server, followed by the data processing method to find nine additional analytical parameters.
2024-09-28. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S30 · Grade B
MDPI, Sustainability
Six-Sigma Reference Model for Industry 4.0 Implementations in Textile SMEs
The implementation of small pilot projects is recommended to test and validate the effectiveness of selected I4.0 technologies.
2023-08-19. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S31 · Grade B
MDPI, Sensors
A Review of IoT Sensing Applications and Challenges Using RFID and Wireless Sensor Networks
Also, time synchronization between the nodes and spectrum sharing techniques are of the utmost importance to ensure the integrity of the data or avoid uncertainty in the sensed data, without consuming all the radio resources [37].
2020-04-28. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S32 · Grade A
World Bank Enterprise Surveys
Enterprise Surveys: What Businesses Experience, Cameroon 2024 Country Profile
Figure 8 shows the extent to which firms face failures in the provision of electricity as measured by the percent of firms experiencing electrical outages and by the number of power outages.
2025. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S35 · Grade A
United Nations Industrial Development Organization
Industrial Development Report 2020: Industrializing in the digital age
In Ghana, for instance, almost 70 percent of firms surveyed for this report fall in the analog category.
2019. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S40 · Grade A
Eclipse Foundation
Sparkplug Specification 3.0.0
The intent and purpose of the Sparkplug Specification is to define an MQTT Topic Namespace, payload, and session-state management that can be applied generically to the overall IIoT market sector, but specifically meets the requirements of real-time SCADA/Control HMI solutions.
2022-11-16. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S0501 · Grade A
OPC Foundation and VDMA
OPC 40001-1: OPC UA for Machinery, Part 1: Basic Building Blocks (v1.04.1), Section 14: Operation Counter
OperationDuration is the duration the MachineryItem has been powered and performing an activity. This counter is intended for machines and components where a distinction is made between switched on and in operation.
2026-01-01. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S0502 · Grade A
OPC Foundation and VDMA
OPC 40001-1: OPC UA for Machinery, Part 1: Basic Building Blocks (v1.04.1), Annex C.2: Example interpretation for ISO 22400
Table 69 proposes how KPI time elements according to ISO 22400-2 can be set using the combinations of MachineryItemState, MachineryOperationMode and HLS-ConditionState. These ISO 22400-2 KPI time elements can be used to do KPI calculations.
2026-01-01. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗c05-S0503 · Grade A
National Institute of Standards and Technology
CSRC Glossary: unidirectional gateway (from NIST SP 800-82 Rev. 3)
The hardware permits data to flow from one network to another but is physically unable to send any information at all back to the source network. The software replicates databases and emulates protocol servers and devices.
2023-09. Register access date: 2026-10-30. Source provenance is supplied by the paper evidence register.
Open the recorded source ↗