The manual crawl phase and automated phase must write the same logical record. During manual operation, a quality lead enters units inspected, defective units, defect counts, defect class, station, style and disposition. When vision starts, the edge node supplies the detection fields and a person verifies exceptions according to risk. The storage technology may change from workbook to local buffer and central database, but the definitions of numerator, denominator, time period and responsibility must not change. Otherwise the apparent improvement could be nothing more than a change in accounting.
Three measures need explicit separation. Defects Per Hundred Units is total verified defects divided by units inspected, then expressed on a per-hundred-unit basis. It allows several defects on one garment. The defective-unit proportion is garments with at least one verified defect divided by garments inspected. Right First Time is units completed without repair or rework divided by units completed, expressed as a percentage. A garment with two defects counts twice in DHU but once in the defective-unit proportion. Mixing these measures would corrupt both the p-chart and the incentive calculation.
The recommended quality event carries a timestamp, roll or bundle identifier, garment or style identifier where available, station, defect class, severity, model confidence, image reference, coordinates, verifier disposition and final physical disposition. Model confidence is metadata, not a quality KPI. The verifier disposition records whether the detection was accepted, rejected or left pending. The physical disposition records what happened to the item: pass, repair, recut, downgrade or scrap. Keeping those two decisions separate stops a correctly detected fault from being mistaken for a completed corrective action.
An edge study of two-stage fabric inspection explicitly positions its system as assisted triage rather than autonomous acceptance. That boundary matters for the Quality Log. Clearly acceptable frames may pass under an approved rule, while flagged or ambiguous cases receive human review. The log must then record the review state, because unreviewed model alarms are not equivalent to verified defects.[S07]
The inherited inspection register summarises manual defect detection at 60 to 70 percent accuracy and computer vision above 90 percent across more than 40 defect types. Even where a factory reproduces that detection gain, it describes classification performance rather than process improvement. The PMS must show whether verified detections lead to containment, corrected settings and fewer repeat events. Otherwise a better detector can simply produce a longer list of unresolved faults.[R29]
Exhibit 51 shows the proposed path from image to controlled process. The return path is essential. If an action does not restore the signal, the event remains open and escalates. If it does restore the signal, the closure evidence becomes part of the control plan.
Exhibit 52 translates that flow into a compact field contract. It is an illustrative GFT design, not a claim that a factory has already implemented these fields. Its purpose is to make ownership and review cadence inspectable before software procurement begins.
The schema also needs rejection rules. An event with an unknown station, an impossible timestamp, a missing denominator or an unresolved bundle should enter an exception queue rather than silently distorting the KPI. Late-arriving buffered events should retain their original production timestamp and carry a separate ingestion timestamp. That distinction lets the hourly chart reconstruct the actual production period while the interface honestly shows that synchronisation occurred later.
11.3 Verification states protect the KPI from premature accounting
A quality event needs a lifecycle that everyone can read. A model-generated detection begins as unverified. Human disposition can confirm it as a defect, reject it as a false alarm or hold it for further inspection. A confirmed defect then receives a physical disposition and, where action is required, a linked corrective-action record. Closure is a later state supported by process evidence. Collapsing these states into a single detected flag would inflate confirmed DHU, hide pending work and make false alarms look like production failures.
State transitions also protect offline operation. Each edge event needs a durable unique identifier assigned at capture, so store-and-forward synchronisation cannot insert it twice. If a verifier changes a disposition, the system should append a revision with author, time and reason rather than overwrite the original decision. The KPI service reads the latest valid revision, while auditors can reconstruct why the measure changed. This is especially important when several stations reconnect after a network interruption and historical hourly buckets must be recalculated.
The Quality Log should publish its completeness state beside its values. An hourly chart based on verified events alone may look reassuring while a large verification queue remains unseen. The supervisor therefore needs counts for captured, verified, rejected and pending events, plus any periods with missing denominators. Management can then distinguish a genuine low-defect hour from an hour whose evidence is incomplete. This small governance feature prevents operational pressure from turning missing review into apparent quality.