Persistence means that a useful effect survives the conditions for which scale is proposed. GFT recommends repeating the leading measure across relevant fabrics, shades, shifts, loads and maintenance states, with the coverage plan defined before the verification campaign. A result obtained under a narrow range of conditions supports a narrow conclusion. Extension to an untested product route should be recorded as a new qualification task, not included in a broader claim by analogy.
The verifier should examine both performance and evidence quality. Reproduce calculations, check meter condition, trace accepted quantities and reconcile all excluded intervals. Examine whether an adjustment model is being applied outside the conditions used to establish it. Retain unfavourable trials and routine interruptions. Where possible, assign this review to someone who did not operate the trial or prepare its headline result. This is GFT's proposed separation of responsibilities, not a claim that external assurance has occurred.
The scale paper should distinguish observed physical effects, calculated comparable-condition savings, assumed future utilisation and supplier projections. Annualisation should state the eligible production volume and operating window. A measure qualified only for selected recipes should not be multiplied by total factory output. Finance should apply documented site prices and incremental operating costs to the verified resource account. Changed tariffs can affect value without changing physical performance; keep the resource and monetary conclusions separately reproducible.
GFT recommends testing utilisation, accepted yield, energy prices, maintenance burden, cleaning demand and persistence in the scale decision. Where evidence remains sparse, record a conditional scope and a further observation requirement. The reviewer should see what would make the project unattractive or technically unacceptable, rather than only the central case. No universal payback, carbon factor or borrowing case follows from this chapter. The process is an engineering decision framework, not investment, legal or tax advice.
The purchase specification should carry the qualified operating envelope into procurement. Include the duty, test boundary, guaranteed measurement method where agreed, product constraints, service requirements and commissioning evidence. A purchase decision is distinct from commissioning acceptance, and commissioning acceptance is distinct from sustained operating proof. Keep a scale hold point after commissioning, with responsibility for checking whether the installed system continues to deliver under ordinary production conditions.
Commissioning should preserve the separation between equipment functionality and process benefit. GFT recommends checking instrument installation, control sequences, safe shutdown, operator access, maintenance instructions and the agreed acceptance duty before testing savings. Record temporary bypasses and unfinished work. An installation that operates only with supplier intervention has not yet demonstrated routine operability. The final operating trial should identify the skills and service support that sustained performance requires, and the scale decision should account for their availability.
If performance drifts, compare current settings, product mix, meter health, source quality and maintenance history with the qualified envelope. An unexplained drift should suspend the affected claim and reopen investigation. Changing a dashboard target does not resolve a loss of proof. GFT recommends preserving the last valid result with its period and limitation, while reporting current performance separately. This keeps historical evidence useful without presenting it as a current operating achievement.